Guide

How much does it cost to build an app?

Updated October 2026 · Nabee Studio

Building a native mobile app is a five-figure project for anything real. At Nabee Studio, an iPhone, Android and Apple Watch app is a Custom build: $30,000 for iPhone + Android ($20,000 for one platform), payable over 12 months at 0% and yours once paid. A SaaS or web platform is priced from standard Custom parts (sites from $15,000, web app MVP $18,000) and payable over 12 months at 0%. No hourly billing.

App cost estimates online swing wildly because the word "app" hides enormous variation. A single-screen utility and a two-sided marketplace with payments, accounts, and an admin dashboard are both "apps," and they are not remotely the same amount of work.

What are you actually paying for?

Most of an app's cost is not the screens you see. It is the invisible machinery: accounts and authentication, a backend and database, payments, an admin panel to run the thing, notifications, and the app-store submission and review process on both Apple and Google. A polished front end sitting on top of all that is the smaller half of the job.

This is why "I just need a simple app" quotes rarely stay simple. The simple part is the interface. The unsimple part is everything that makes the interface do something useful and safe.

What drives app cost up or down?

FactorCheaperMore expensive
PlatformsOne platform (iOS or web)Native iOS + Android + web
Accounts & rolesSingle user typeMultiple roles, permissions, admin
PaymentsNone or simple checkoutSubscriptions, payouts, marketplace
Data & integrationsSelf-containedThird-party APIs, real-time sync
Content volumeSmall, staticLarge, structured, multi-language

Two of our own products show the spread. Metro X is a practice app for web, iPhone, iPad, Android, Apple Watch and Apple TV (metronome, tuner, sheet music, accompaniment and multi-device sync) — deep in one craft, with real-time audio and device sync underneath. My Permit Pass is a test-prep platform carrying 600+ questions per state across all 50 states and D.C., five languages, animated road scenes and an AI tutor — broad, data-heavy, and a lot of content machinery underneath. Same word, very different builds.

How does Nabee Studio price apps?

At Nabee Studio, an app is a Custom build, run by the same team as your website and ads: $30,000 for iPhone + Android ($20,000 for one platform), payable over 12 months at 0% and yours once paid. It covers product design, build, and submission to both stores. A SaaS or platform build is priced from standard Custom parts and payable over 12 months at 0%, with the backend connected to whatever commerce stack fits — Shopify, Stripe, headless — or built fully custom.

You get one quote before work starts, not an hourly meter. The number is lower than a typical agency because one team owns the whole arc and reuses the auth, billing, and infrastructure patterns we already solved shipping our own products. See pricing for the full picture.

Should you build the whole thing at once?

Usually not. The cheapest version of an expensive app is the one you scope down to its real core first. Deciding what to leave out is the highest-leverage cost decision you will make — our guide to scoping an MVP walks through how to cut without gutting the product.

Ongoing cost matters too. Apps live in two stores that change their rules constantly; OS updates, store-policy compliance, and crash monitoring are not optional. At Nabee Studio, that upkeep is part of the monthly app add-on rather than a separate bill.

Ready to price yours?

Bring us the core idea and the two or three things it must do. We scope once and send one number with a real timeline — apps and platforms ship in two to three months. Start with a free growth check: a 5–10 minute video review of your site and ads within 48 hours.

Common questions

How much does it cost to build a mobile app?
Anything genuinely useful is a five-figure project. At Nabee Studio, an app through both app stores is a $30,000 Custom build ($20,000 for one platform), payable over 12 months at 0% and yours once paid, and a web platform or SaaS is priced from standard Custom parts and payable over 12 months at 0%.
Why do app quotes vary so much?
Because most of an app is invisible — accounts, backend, payments, admin, notifications, and store submission. Two apps that look similar on screen can differ enormously in the machinery underneath, and that machinery is the cost.
Is it cheaper to build for one platform first?
Often, yes. Building only iOS or only web reduces cost, and scoping down to a focused first version reduces it more. See our MVP scoping guide.
What are the ongoing costs of an app?
Apps need OS and SDK updates, store-policy compliance, crash and performance monitoring, and bug fixes. At Nabee Studio, that's covered by the monthly app add-on.
How long does it take to build an app?
At Nabee Studio, apps and SaaS platforms ship in two to three months. You get the real date in writing before you commit.
Does Nabee Studio use hourly billing for apps?
No. The app is a flat monthly add-on and bigger builds get one quote up front. If scope changes, we quote the change rather than running up an hourly meter.

Get a free growth check

A 5–10 minute video review of your site and ads. No call required.